Skyscraper curtain wall installation faces unique challenges: tight building tolerances, high wind loads, complex anchorage grids and constrained site logistics. Elevation variance between floors requires flexible anchors and shims to accommodate slab tolerances; poor tolerance planning leads to misalignment and water-tightness issues. Crane access and façade access systems for hanging unitized modules or lifting glass-heavy units must be coordinated early in the construction program, particularly in dense city centers like Dubai Marina or Business Bay where staging areas are limited. Wind loads at high elevations impose strict testing and engineering requirements for mullion strength, anchor capacity and panel retention systems. Thermal movement from large glazed areas and large daily temperature swings in Gulf climates requires movement joints and perimeter systems engineered for expansion without sacrificing seal integrity. Sand and dust during installation can contaminate gaskets and sealant bonds, so we recommend protective covers and scheduled cleaning prior to sealing. Coordination with MEP and slab tolerances, careful logistics planning for module delivery, and factory-validated unit testing reduce on-site variability. As an experienced curtain wall manufacturer, we provide erection drawings, shop drawings, mock-ups and site supervision to mitigate these risks and ensure efficient, code-compliant installation for high-rise projects.